loading
Brush Product

photos: getting ready to drill a tunnel for the evergreen linesign up / sign insign in to your accountsign in to your accountaccount deactivatedaccount reactivation failedaccount activatedemail verification requiredalmost done!almost done!verfiy your emai

by:Meixin     2020-05-15
Half of the tunnel drill was lowered to the north gate of the Evergreen Line at Port Moody.
Ward Peran/PNGWorkers are ready to put half of the tunnel rig into the north gate of the Evergreen Line at Port Moody.
Ward Peran/PNGWorkers are ready to put half of the tunnel rig into the north gate of the Evergreen Line at Port Moody.
Ward Perrin/PNGWorkers remove the transport bracket from half of the tunnel rig and place it in the north gate of the Evergreen Line in Port Moody.
Ward Perrin/PNGWorkers remove the transport bracket from half of the tunnel rig and place it in the north gate of the Evergreen Line in Port Moody.
Ward Peran/PNGHalf of the tunnel rig was put down and entered the north gate of the Evergreen Line of Port Moody.
Ward Peran/PNGHalf of the tunnel rig was lowered to the north gate of the Evergreen Line of Port Moody.
Ward Peran/PNGHalf of the tunnel rig was lowered to the north gate of the Evergreen Line of Port Moody.
Ward Peran/PNGHalf of the tunnel rig is located at the north gate of the Evergreen Line in Port Moody.
The tunnel boring machine will usher in the Burquitlam station.
Ward Peran/PNGHalf of the tunnel rig is located at the north gate of the Evergreen Line in Port Moody.
The tunnel boring machine will usher in the Burquitlam station.
Custom message
Chat Online
Chat Online
Leave Your Message inputting...
Sign in with: